Posted By Jeff Manion
We do provide this service.
Since 2007 we have provided this to various operations - demolition, replacement heating in church buildings, replacement heating in managed blocks of flats, block of flats - minor works internal decoration.
Demolition project, advised client not required - client insisted, so low key documentation provided / requested to PC, relevant to works and operation final documentation minimal.
Church location - was border line - advised Church Committee, not notifiable and to have in place a low key approach. The M&E engineers experienced and knowledgeable, one contractor (PC) to be on site full time (max of four persons) with contracted controls engineers (two persons). One church member "had HS Knowledge" was not keen that it was not notifiable and wanted to review my comments, he spoke to insurer, who then stated the are required required. It cost the church, but not a necessary approach.
Block of flats, board member knows about health and safety on this and that subject matter and insists CDM notifiable, works in my opinion was not notifiable, the value around £30K, they insisted CDMC in place, they found one for around £2K!
Another project met the CDMC a Tech IOSH, spouting this and that regulation, did not like the contractors approach to working at height, design by others considered risks and were appropriate for this operation. The CDMC turned up on the day the "pre-contract" meeting took place and a week later provided the pre-construction information.
He insists that he (CDMC) will review and comment on RA / SSOW / MS prior to works commencing, wow fees, fees and more fees.
Another one decommissioning project, several millions am the CDMC - when completed hole in the ground, little information to hand over, but the client wants in the HS File, the HS plan, RA, MS, SSOW, induction records, etc etc. As this is what they have had before.
JM
Could continue.