#1 Posted : 13 September 2007 10:26:00(UTC)
Rank: Guest
Admin

Posted By naomi Hi All Has any kind sole out there got a risk assessment on actions to take if an operative was taken ill inside an enclosure where they are removing asbestos. Thanks in advance Naomi
Admin  
#2 Posted : 13 September 2007 15:54:00(UTC)
Rank: Guest
Admin

Posted By Liesel Hi Naomi, I'm not quite sure if this is what you are after, but paras 6.68 to 6.70 of HSG 247 (Asbestos: the licensed contractors' guide) outline the considerations and arrangements for emergency procedures when working in enclosures with asbestos. Reference is made to the possibility that the person's respirator may have to be removed at an early stage, and it is explained that evacuation of the seriously ill or injured employee should not be delayed by "over elaborate attempts to decontaminate the casualty." Also noted is the need to have established arrangements for contacting the emergency services and making info available to them. Emergency procedures for the evacuation of ill or injured personnel should have been built into the planning stage and detailed in he written assessment. This is also required under CAR Reg 15 so if you are having work done by licensed contractors it should be in their RA and written plans of work. I hope that helps, if you want more info feel free to drop me a note.
Admin  
#3 Posted : 14 September 2007 00:43:00(UTC)
Rank: Guest
Admin

Posted By Karen Wilson As per the previous response. The safety and well being of the injured party is of primary concern. (It has been known for the integrity of tents to be disturbed in order for casualties to be removed to a place of safety and for treatment to be administered - [I remember this happening to my boss many years ago]} Decontamination process is to a minimum. Risk wise - treatment for casualty is life threatening - and urgent - therefore takes priority. Highest risk environments invariably include - working at excessive height or in conditions where steam pipes remain switched on. Hope this helps a little. Refer however to the paragraphs and Regulations detailed in response from Liesel. Regards Karen
Admin  
#4 Posted : 14 September 2007 10:28:00(UTC)
Rank: Guest
Admin

Posted By Dave Wilson Naomi, These should be contained in a 'Generic Method Statement' for all Licensed Asbestos work (HSE call them Standard Procedures). As licensed contractors they have to send a copy of these the the HSE ALPI at the office where their licence is held, a copy of these also has to be available on site at all times when undertaking asbestos work. The reason for this is all this info used to be sent to the HSE as part of the ASB5/ Licensing conditions for ALL Licensed work, as you can appreciate sending a 70 page document every time you notify was an admin nightmare for the HSE, so a decision was taken that the GM Statement is held at the Alpi and a Site Specific MS would be produced for each job. See ALG Memo 05-03 which you can down load free from http://www.hse.gov.uk/ab...ngs/alg/memos_issued.htm
Admin  
#5 Posted : 14 September 2007 10:29:00(UTC)
Rank: Guest
Admin

Posted By Dave Wilson Sorry 02-03
Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.