Posted By Chris Mac Opinions on some planned works in a confined space.
Work is to be done in a vessel that is used for storing causting in a CIP clean. The job is to do some Crack Detect work, initially covering the internal walls with Ardrox 970-p23, then using a UV light, then doing the necessary welding.
What would your proposed method of work entail? I am having a bar put in place across the entry hole to allow for a harness to be attached as a method of escape, 2 guys assisting and so on. I am now looking at ventilation issues and necessity of respiratory gear etc.
Advice and thoughts welcomed to see if they are in line with mine and to anything I/the works planner may have overlooked
|
|
|
|
|
|
Rank: Guest
|
Posted By Raymond Rapp Chris
Not familiar with the system of work or substances you have described (nor is anyone else by the lack of response) but when I wrote our company confined space procedure I relied on the aforementioned ACOP. I suggest you do the same, assuming no other responses.
Ray
|
|
|
|
|
|
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.