Welcome Guest! The IOSH forums are a free resource to both members and non-members. Login or register to use them

Postings made by forum users are personal opinions. IOSH is not responsible for the content or accuracy of any of the information contained in forum postings. Please carefully consider any advice you receive.

Notification

Icon
Error

Options
Go to last post Go to first unread
Admin  
#1 Posted : 06 October 2009 13:54:00(UTC)
Rank: Guest
Admin

Posted By colin james clark Hi All, I am on-site at the moment working with the civil contractors,we are currently digging trial holes under the CDM Regs (which by the way gives exelent guidance.) Bearing in mind the Working At Height Regulations,we are digging no more that 1.5 meters. so here is my question. Best practice would be to dig steps into the excavations however, due to the rainy weather is there any suggestions or any thing on the market that we could use and put forward as a best practice,there is no need to shore the sides as we have risk assessed and asked our engineer to inspect and record the conditions daily.I would like to avoid putting in a temporary wooden step. Thank you in advance for any comments. Colin
Admin  
#2 Posted : 06 October 2009 15:04:00(UTC)
Rank: Guest
Admin

Posted By Vrick Colin Since the environment has changed, there must be something which will change in your RA. The soil condition will not be the same; In my opinion it follows that soil saturation with water will cause its easier displacement/movement and therefore the risk of the sideways collapsing increases. So to prevent any accident/incident, shoring would be the best practice unless lab tests have been carried out to shows that the rainwater does not have any effect on the soil. members fro specialist branch may still supplement what I'm contributing. Vrick
Admin  
#3 Posted : 06 October 2009 15:34:00(UTC)
Rank: Guest
Admin

Posted By Bob Youel you are 'working at height' if you are standing on the edge of an excavation / an excavation is a confined space if you are in it [obviously depending on the situation] and people have died in less than 1.5! Just some ideas for your R-Assessment
Admin  
#4 Posted : 06 October 2009 22:53:00(UTC)
Rank: Guest
Admin

Posted By Ron Hunter What is the purpose of the excavation? Are persons expected to enter it? Is edge protection provided appropriate to the conditions and machinery and plant in use? Is the excavation secured or covered to prevent inadvertant access?
Admin  
#5 Posted : 07 October 2009 07:53:00(UTC)
Rank: Guest
Admin

Posted By colin james clark Hi All, As I have stated the excavation is in its self suitable as a trial hole and has been risk assessed. The question is is there anything on the market to safely access and egress the trial as this is no more than 1.5 Meters. Colin
Admin  
#6 Posted : 07 October 2009 08:16:00(UTC)
Rank: Guest
Admin

Posted By Bob Youel you have provided the depth but what about the length/width as they are important factors as is the soil type There are all kinds of bespoke shuttering systems on the market and some that are specially designed for cemeteries are especially good for smaller areas noting that you cannot have the same cross supports when tackling a coffin than you can have in an average hole
Admin  
#7 Posted : 07 October 2009 10:07:00(UTC)
Rank: Guest
Admin

Posted By steve hardcastle ground force et al provide a range of different size trench boxes, access/egress can then be attached to the trench box. bit confused by the original post, an unstepped/unbattered back 1.5 M excavation that has been RA'd as suitable for entry? 500mm could easily break and ankle/leg!
Admin  
#8 Posted : 07 October 2009 10:07:00(UTC)
Rank: Guest
Admin

Posted By steve hardcastle ground force et al provide a range of different size trench boxes, access/egress can then be attached to the trench box. bit confused by the original post, an unstepped/unbattered back 1.5 M excavation that has been RA'd as suitable for entry? 500mm could easily break and ankle/leg!
Admin  
#9 Posted : 07 October 2009 12:52:00(UTC)
Rank: Guest
Admin

Posted By Ron Hunter Unless the sides are themselves sloped or battered you need a trench box. Even at this depth there is a risk of entrapment.
Users browsing this topic
Guest (2)
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.