Welcome Guest! The IOSH forums are a free resource to both members and non-members. Login or register to use them

Postings made by forum users are personal opinions. IOSH is not responsible for the content or accuracy of any of the information contained in forum postings. Please carefully consider any advice you receive.

Notification

Icon
Error

Options
Go to last post Go to first unread
nathanhu  
#1 Posted : 14 August 2012 10:49:15(UTC)
Rank: Forum user
nathanhu

good morning Ladies/ Gents, I am in a Engineering role within a oil and gas firm, based in Europe. we have contractors on site using Forklift trucks and extended reach forklifts. i am a litle concerned that the contractors are using one of the forks as a lifting hook, i.e. fitting a sling and hanging I beams on the sling. although this in out of the HSE rules for UK, we try to adopt best practice when possible. is this allowed in UK? ive been asked the question, but i dont want to go through the HSE department on site as there have already authorised this practice. my concerns- swinging weight, chance that the load could slip off if the sling sides off the end of the fork, edges of the fork damaging the sling leading to object falling. i would assume that this could be remidied with the use of a crane adaptor for the forklift? your thoughts would be welcome
JYoung  
#2 Posted : 14 August 2012 10:56:29(UTC)
Rank: Forum user
JYoung

I would suggest that they need to be using both forks in order to steady the load. It is not best practice but has been done. Forklifts can be used for lifting providing they have been tested and the weight is not above their capacity, has a lift plan been completed? It does not need to be as complicated as say a tower crane or mobile crane lift plan but there should still be something in place. I would suggest that under best practice they use a specific lifting attachment, complete a lift plan and have it suitably supervised.
nathanhu  
#3 Posted : 14 August 2012 11:23:50(UTC)
Rank: Forum user
nathanhu

Thank you for your reply, I also agree regarding the method of using both forks to support the load.
edwardh  
#4 Posted : 14 August 2012 13:57:28(UTC)
Rank: Forum user
edwardh

"Crane adaptors" don't have to be the full jib arrangement. A lifting point that clamps to one or both tines would reduce the risk of the strop slipping [or being cut by the fork tine edge]. One example-- http://www.liftingsafety...ok-3033.html#Description
Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.