Welcome Guest! The IOSH forums are a free resource to both members and non-members. Login or register to use them

Postings made by forum users are personal opinions. IOSH is not responsible for the content or accuracy of any of the information contained in forum postings. Please carefully consider any advice you receive.

Notification

Icon
Error

Options
Go to last post Go to first unread
Zimmy  
#1 Posted : 01 February 2013 16:09:02(UTC)
Rank: Super forum user
Zimmy

That took some time to write! If you have an installation that has not been tested for over say twenty years, then this is the way to do it. First get an electrical safety survey carried out. This will highlight the areas where any urgent work is needed. Work such as bonding, live cables hanging from walls etc all Code 1. If you have the funds get it over with and bite the bullet and order a full inspection and test. This will give you a safe base to work from. You will then have a sound platform to build a rolling program of inspections etc. To do this another way is folly. Some will say just put a rolling test from the start but whatever you do get a survey done first. Think about it, you get the first floor tested but the ground floor is a death trap. And please, when things are repaired or replaced make sure that you have the certificates for the work or you will not be able to prove that maintenance is carried out as per legislation.
tony.  
#2 Posted : 01 February 2013 21:07:02(UTC)
Rank: Forum user
tony.

Bonding code 1? Do you mean lack of bonding?
Zimmy  
#3 Posted : 02 February 2013 09:16:45(UTC)
Rank: Super forum user
Zimmy

Of course, did you think I was going to remove it? Join in Tony what do you think?
tony.  
#4 Posted : 02 February 2013 13:14:39(UTC)
Rank: Forum user
tony.

Zimmy, I'm afraid i dont know what you mean by 'join in' It's just that you are offering advise on a subject and your advise wasn't clear thats all. No offence meant
Zimmy  
#5 Posted : 02 February 2013 18:49:35(UTC)
Rank: Super forum user
Zimmy

None taken Tony. I was just that one of my other posts was pulled off before I could post this info. As ever, a bit rushed. It was to be a part of another post. It is just to say that before committing to any testing of a large building that may need to be carried out in stages, first get the overall picture and then make a plan. I was hoping that you or others would add something or put forward a better plan.
Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.