#1 Posted : 06 May 2013 19:47:10(UTC)
Rank: New forum user
murphy23

Hi all, I am helping plan a job where large concrete segments have to be lifted into position to create the roof of a large diameter shaft, the shaft is 20 meter diameter. First a number of beams will be lifted into position to create the supports for the segments, these will be supported by a central column. Secondly the segments will be lifted into position, starting from the middle working backwards. I was just wondering if anyone has done something similar in the past and came up with a good solution for work at height. The slings will need to be detached manually and segments guided into position from close range. The shaft is round 20 meters deep, there is a handrail at ground level so operatives can walk safely around the perimeter. Thanks
Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.