Hi All
I have moved to an industry that does not use scaffolds regularly and therefore fallen out of sync with scaffold guidance, and therefore missed the TG20:13 update.
I have an independently tied scaffold with 7 lifts and a gantry (height 3 meters). Is this now acceptable and in scope of the new TG20 Guidance or, should there be a design compiled and available for this?
Any help would be much appreciated.
Thanks
|
|
|
|
Rank: Forum user
|
"Unless a scaffold is a basic configuration described in recognised guidance e.g. NASC Technical Guidance TG20 for tube and fitting scaffolds or manufacturers' guidance for system scaffolds, the scaffold should be designed by calculation, by a competent person, to ensure it will have adequate strength and stability".
Also are materials likely to be stored on the scaffolds? If so then a design should be done to include weight limis etc. There is an interactive guide available to through NASC website, might be worth a look.
|
|
|
|
Rank: Super forum user
|
JYoung wrote:"Unless a scaffold is a basic configuration described in recognised guidance e.g. NASC Technical Guidance TG20 for tube and fitting scaffolds or manufacturers' guidance for system scaffolds, the scaffold should be designed by calculation, by a competent person, to ensure it will have adequate strength and stability".
Also are materials likely to be stored on the scaffolds? If so then a design should be done to include weight limis etc. There is an interactive guide available to through NASC website, might be worth a look. Thanks JYoung - Is this an excerpt from TG20:13? As this is the same statement as TG20:08. Also, is there a list of scaffolds in TG20:13? And lastly, is a gantry over a walkway a "design scaffold" in the updated guidance?
|
|
|
|
Rank: Forum user
|
If i was you i would be asking the scaffold contractor for a copy of the compliance sheet relating to the scaffolding that you have mentioned.
Take a look on the NASC website to give yourself a brief update.
|
|
|
|
Rank: New forum user
|
TG20:13 accommodates scaffolding as described, if by gantry you mean a hoist frame. Normally a gin wheel may be used to lift a maximum of 50 kg.
The tie pattern must comply with TG20 and be pull tested.
|
|
|
|
Rank: Forum user
|
Keeping it simple
You need a compliance sheet for the independent and a design for the gantry.
If the independent is erected off the gantry then you need a design for the whole structure.
|
|
|
|
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.