Tony T  
#1 Posted : 05 February 2015 13:21:10(UTC)
Rank: Forum user
Tony T

Hi,

Does anyone have an up to date powerpoint presentation on the changes to CDM2007 to CDM2015?

Thanks in advance to anyone who can assist.
RayRapp  
#2 Posted : 06 February 2015 10:39:46(UTC)
Rank: Super forum user
RayRapp

Tony, either no one has one or they are not prepared to share it. Have you checked out the HSE website to see if there is anything useful?
Rus1969  
#3 Posted : 06 February 2015 11:40:21(UTC)
Rank: Forum user
Rus1969

I have the APS presentation-if you want a copy IM me directly with email address.
Blue  
#4 Posted : 06 February 2015 12:24:14(UTC)
Rank: Forum user
Blue

I was about to post the same question when I saw this thread.
Ron Hunter  
#5 Posted : 06 February 2015 14:36:53(UTC)
Rank: Super forum user
Ron Hunter

I do have one prepared, but it is somewhat specific to my own employer's perspective.
I suggest any ppt. needs to include information about the 7 key changes:

1. CDM-C replaced by Principal Designer
2. New threshold for Client appointment of Principal Designer and Principal Contractor (> 1 contractor)
3. A Construction Phase Plan for all Construction Sites (a proportionate approach)

4. Revision to current Notification criteria to align with TMCSD
5. Duties extend to domestic Clients (requirement of TMCSD)
6. Removal of explicit competency requirements
7. Simplified structure to Regulations. Targeted Guidance. Removal of ACoP.

I'll reserve my own thoughts on the revisions, new draft guidance etc. for now...........!
bob youel  
#6 Posted : 06 February 2015 16:54:43(UTC)
Rank: Super forum user
bob youel

& don't forget to note that CDM is not a be all law it is but 1 law among many that can apply to a construction site all of which a client etc. needs to comply with, so the site management system needs to account for the other laws especially with regards to having adequate management systems in place along side a competent H&S person
Palmer20061  
#7 Posted : 06 February 2015 17:57:10(UTC)
Rank: Forum user
Palmer20061

Having been to a CDM presentation today from the HSE (who were unable to give a copy of the presentation) they were keen to point out that the CDMC role has not been replaced by the principal designer role - they are two different (but similar!) roles.

The CDMC role is gone and the PD has to; coordinate the design stage of the project and act as a conduit between the design & build teams.

Other CDMC duties should be subsumed by the PC.
6foot4  
#8 Posted : 06 February 2015 19:53:21(UTC)
Rank: Forum user
6foot4

Palmer20061 wrote:
Having been to a CDM presentation today from the HSE (who were unable to give a copy of the presentation) they were keen to point out that the CDMC role has not been replaced by the principal designer role - they are two different (but similar!) roles.

The CDMC role is gone and the PD has to; coordinate the design stage of the project and act as a conduit between the design & build teams.

Other CDMC duties should be subsumed by the PC.


......and a competent H&S advisor as required under reg 7 of the Management regs. Why do so many people miss this?
Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.