Welcome Guest! The IOSH forums are a free resource to both members and non-members. Login or register to use them

Postings made by forum users are personal opinions. IOSH is not responsible for the content or accuracy of any of the information contained in forum postings. Please carefully consider any advice you receive.

Notification

Icon
Error

Options
Go to last post Go to first unread
Bazzer  
#1 Posted : 18 April 2017 21:02:48(UTC)
Rank: Forum user
Bazzer

A client is required to trim hedges from a public footpath which is probably only 1m wide but with a grass verge; so there is a risk to users of the footpath, from the works (hedge shears) and from the debris created which if wet can be slippery. I have suggested to the client that they close the footpath for the duration  of the work (2-3 hours) and divert pedestrians to the footpath on the opposite side of the road (not onto the grass verge). As they work, they will clear up behind them and move the diversion signage as they go.

For such a short duration, would my client have to get permission from the council everytime they do the work which would be probably twice a year.

Another option is to clear up as they go, and provided there is a clear path, stop work whilt the pedestrian passes. Not sure how heavy the foot traffic is or the road for that matter

pm1965  
#2 Posted : 19 April 2017 05:43:49(UTC)
Rank: Forum user
pm1965

I think you may have answered your own question with the last sentence you have written. I would think twice about diverting pedestrians to the other side of what may be a busy road, in my opinion you are just adding risk. Can this work be completed in the evening when there are less likely to be pedestrians and children around?

Bazzer  
#3 Posted : 19 April 2017 07:52:07(UTC)
Rank: Forum user
Bazzer

I would have thought directing pedestrians to the opposite footpath is only the same as when utility companies are digging up the footpath

boblewis  
#4 Posted : 19 April 2017 08:18:01(UTC)
Rank: Super forum user
boblewis

But you do need LA permission to close a footway and/or  carry out works, even without closure, on the public highway which includes footways and verges.  Chapter 8 also comes into the equation even for mobile works.

biker1  
#5 Posted : 19 April 2017 09:04:29(UTC)
Rank: Super forum user
biker1

You haven't said what type of hedge it is. This could be a consideration. Hawthorn hedges, for instance, pose a threat, as the thorns are very sharp and can pierce tyres, thin shoes, dog paws. I certainly wouldn't want to walk along a pavement when trimming of such a hedge is taking place until it had been thoroughly cleaned up, and a puncture in the tyres of a mobility scooter would be a major problem for the person concerned. Most other hedges don't pose such a risk; conifer hedges are one of the most popular.

Unless the road is particularly busy, I would have thought that getting permission to close the pavement for the duration would be best, especially when you consider the narrowness of it, and the probable use of equipment such as hedge strimmers, which pose a similar risk to chainsaws.

walker  
#6 Posted : 19 April 2017 09:19:14(UTC)
Rank: Super forum user
walker

Whatever you decide, you have until September to come up with a solution as you should avoid hedge cutting during the (bird) nesting season 

Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.