Rank: New forum user
|
Good morning all, I have been asked to do a RA for using a 1.5t hoist for loading materials on site. We will also be using strapping for the lifts. Has any of you done one before and can offer any advice?
Thanks in advance
Tillie
|
|
|
|
Rank: Forum user
|
You need to be very careful in these operations. A 'standard' or generic RA won't do as it will have to be tailored to the types of loads and equipment. e.g If the load was to fall what could be the result? Is it hazardous substances or bricks? Is the hoist manual operated or electric or hydraulic?
Bit more detail and maybe I can help?
PM me if you want my email address.
|
|
|
|
Rank: Forum user
|
If you google" L.O.L.E.R lifting plan template ", it will help.
|
|
|
|
Rank: Forum user
|
As this comes under LOLER would lifting plan be required ? It seems overkill but we have completed these for hoist, that way you can deal with typical loads that re to be lifted
Regards
PaulR
|
|
|
|
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.