KOBE  
#1 Posted : 16 January 2013 14:50:24(UTC)
Rank: New forum user
KOBE

hi Lads to those who had more experience in commissioning of Power Plants, may you help me with information or some templates of how i can start a Generic Risk Assessment for Commissioning works. Thank you, your help is appreciated.
jontyjohnston  
#2 Posted : 16 January 2013 16:00:53(UTC)
Rank: Super forum user
jontyjohnston

KOBE I was the HSE Manager on a 600MW CCGT build and commission. I have a load of commissioning assessments. PM me with your email and I will send you some material this evening. Jonty
John M  
#3 Posted : 16 January 2013 16:31:07(UTC)
Rank: Super forum user
John M

I have built and commissioned no less than 9 power station across the globe and indeed in the UK. The main contractor (EPC) together with the client power generator always had a suite of assessment templates to be populated as required. I would start at their H&S Department. Purloining safety documents for use by AN other is simply not cricket and in my book most unprofessional. Wy not prepare your own if the EPC or Clients' route fails. Jon
KOBE  
#4 Posted : 16 January 2013 19:41:46(UTC)
Rank: New forum user
KOBE

hi Jonty Thank you so much, here is my email address private is christopherkobe@hotmail.com or work email is christopher.kobe@gama.com.tr
KOBE  
#5 Posted : 16 January 2013 19:45:30(UTC)
Rank: New forum user
KOBE

on Generic Risk Assessment for Power Plant(CCPP) Commissioning works , Thank you Jonty, my email address is christopherkobe@hotmail.com
KOBE  
#6 Posted : 16 January 2013 20:46:06(UTC)
Rank: New forum user
KOBE

hi Jonty Thank you for your response , my email is christopherkobe@hotmail.com
bob youel  
#7 Posted : 17 January 2013 07:44:31(UTC)
Rank: Super forum user
bob youel

Some good advice given here; and after working in that industry for many years I have found the term generic less than useful nor helpful Are you asking about all aspects of comissioning such plant or do you mean comissioning specific parts as an overview RA for comissioning a whole plant is probably not what is required as one area is different to another area What is the background to your question?
KOBE  
#8 Posted : 17 January 2013 19:43:55(UTC)
Rank: New forum user
KOBE

An Overview Risk Assessment is what i am looking for in general terms not specif. Thank you, i dont know if i manged to give you a picture of what i am looking for.
John M  
#9 Posted : 18 January 2013 11:19:32(UTC)
Rank: Super forum user
John M

Totally confused. Jon
Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.