We have a large patenting furnace with air/gas pre mix burners, 4 zones in furnace with about 10 burners per zone. By design from standards above, can it be possible that if 1 burner in a zone fails, it can be switched out of the group electrically but the gas/air mix to the burner is a manually operated valve which can be left open, this allowing the remaining burners to light and run with the dangerous situation of the gas/mix from the locked out burner to enter the furnace?
Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.