#1 Posted : 12 June 2002 11:43:00(UTC)
Rank: Guest
Admin

Posted By David Whitfield I have been asked about the legal requirements of siting an electrical sub station next to an office complex (with a view to the safety of the office workers inside). Other than Regs 4 - 7 of the EAWR 89, can anyone working in this area provide any further info on the legalities? Regards Dave W.
Admin  
#2 Posted : 13 June 2002 12:38:00(UTC)
Rank: Guest
Admin

Posted By George Wedgwood David, a lot depend on the type of switchgear contained and on the prospective fault levels of the installation. Clearly, if oil filled switchgear were used it could pose a significant risk in close proximity to public access. However, it will be more likely as it will be a new sub, that the gear if SF6 filled and reasonable safe unless entry is required to the sub. The type of containment is also important as some new fibreglass containers are little resistance to an explosive failure - but these subs are inherently reliable in the main as probabilistic analysis of historic failures does not show a significant problem. However, if the sub is large and contains oil-filled insulators for example, make sure you stay well away! These can explode violently with little notice and fragments can travel in excess of 50 metres! Even cable joint boxes (found in mopst subs) can explode violently if moisture find its way in. So all in all, you would be best to find a 'quiet corner' to site this in, with a minimum of 10 metre space from public access all the way round it, to be safe. It really needs a technical risk assessment to quantify the detail and the Regional Electricity Company involved should be asked to provide this. It should include security and containment and well as explosion venting details. I hope this helps a bit. Regards, George Wedgwood FIOSH RSP
Users browsing this topic
Guest (2)
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.