Rank: Guest
|
Posted By Tina Hansen
I work with multiple sites and we are trying to develop a standardized system for our sites to perform risk assessments.
Does anyone have any experience or recommendations or ideas of how to deal with this issue?
|
|
|
|
Rank: Guest
|
Posted By Raymond Rapp
Tina
From the lack of responses I would say there is a good chance a standard formula does not exist. I suggest you choose a suitable model and utilise it for each location. Only advice I could give is to keep it simple.
Good luck.
Ray
|
|
|
|
Rank: Guest
|
Posted By CJP
Within Europe I would build on the basic requirement from Article 6 of Directive 89/391/EEC, making the assumption that each country has aligned with it. OK it does not say how to do a risk assessment but it does define the expected outcomes. Namely:
following general principles of prevention:
(a)avoiding risks;
(b)evaluating the risks which cannot be avoided:
(c)combating the risks at source;
(d)adapting the work to the individual, especially as regards the design of work places, the choice of work equipment and the choice of working and production methods, with a view, in particular, to alleviating monotonous work and work at a predetermined work-rate and to reducing their effect on health.
(e)adapting to technical progress;
(f)replacing the dangerous by the non-dangerous or the less dangerous;
(g)developing a coherent overall prevention policy which covers technology, organization of work, working conditions, social relationships and the influence of factors related to the working environment;
(h)giving collective protective measures priority over individual protective measures;
(i)giving appropriate instructions to the workers.
|
|
|
|
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.