Posted By VJ
Would be acceptable if run live gas pipe along with the other utility supplies into a construction area (where heavy work will be carried out) at the begging stage of the project?
I am hopping to avoid digging again at latter stage.
Many thanks for any advice..
|
|
|
|
|
|
Rank: Guest
|
Posted By Robert.
I believe there is guidance maybe ACOP relating to the proximity of differing UG services and also the mechanical protection that should be afforded to each.
Maybe a check with UU or BT could verify.
|
|
|
|
|
|