Welcome Guest! The IOSH forums are a free resource to both members and non-members. Login or register to use them

Postings made by forum users are personal opinions. IOSH is not responsible for the content or accuracy of any of the information contained in forum postings. Please carefully consider any advice you receive.

Notification

Icon
Error

Options
Go to last post Go to first unread
Admin  
#1 Posted : 11 June 2008 12:15:00(UTC)
Rank: Guest
Admin

Posted By William Wright Hi I am carrying out a risk assessment of my companies engineering workshop and wondered if any one has any existing R/As surrounding small metal working lathes. Thanks William
Admin  
#2 Posted : 11 June 2008 16:24:00(UTC)
Rank: Guest
Admin

Posted By Chris Packham William Will the lathes be operated using metalworking fluid? If so, then any risk assessment has to include potential skin and respiratory exposure to this. Metalworking fluids, and particularly the water mixed variety, are an extremely common cause of occupational ill health. You should check if there is a fluid management system in place within the workplace. Chris
Admin  
#3 Posted : 11 June 2008 22:30:00(UTC)
Rank: Guest
Admin

Posted By Ron Hunter HSE have an example for woodworking on their website. You may find a fair bit of that translates across to engineering (wood v metal). Additional risks with swarf and cutting fluids as opposed to wood dusts. http://www.hse.gov.uk/ri...estudies/woodworking.htm
Admin  
#4 Posted : 12 June 2008 08:34:00(UTC)
Rank: Guest
Admin

Posted By Mitch Good morning William, I do not have a specific RA for lathes just a template for the machine tools we use but I considered the following, •Metal working fluids, respiratory, contact and cleanliness. •Guarding. •Swarf and pellet ejection. •Controls accessibility. Emergency stop etc. •Stopping time. •Preventative maintenance procedure. •Work area/accessibility to the machine, work storage area etc. •Floor conditions, housekeeping. •Lighting. •Ventilation. •Training/competence to use machine. •Finger/Limb trapping (we have one big baby!). Hope this helps. Mitch
Admin  
#5 Posted : 12 June 2008 08:51:00(UTC)
Rank: Guest
Admin

Posted By William Wright Thankyou all for your help, I will take all the advice on-board thanks again.... William
Admin  
#6 Posted : 12 June 2008 09:58:00(UTC)
Rank: Guest
Admin

Posted By Konstanty Budkiewicz William, Be aware that your Company may have already generated a current Provision and Use of Equipment (PUWER) assessment of the affected equipment. This assessment drives the need for process risk assessments. If that document does not exist, I suggest that you backtrack and start from the PUWER regs requirements. This is because they identify all the management and production issues that need consideration (including all of the points raised by previous correspondents), and arranges them in a formal structure of responses that should speed you through your task. Kon CMISH
Admin  
#7 Posted : 12 June 2008 10:57:00(UTC)
Rank: Guest
Admin

Posted By John J William, you have mail, John
Admin  
#8 Posted : 12 June 2008 11:23:00(UTC)
Rank: Guest
Admin

Posted By BigL John j, i've just had a similar request to do our workshop, part of a chemical manufacturing site and with all the hazop and major hazard work undertaken in recent years it seems we've missed quite a few areas and need now to pay a little attention to detail, would be very greatful of any such example. Many thanks
Admin  
#9 Posted : 12 June 2008 11:26:00(UTC)
Rank: Guest
Admin

Posted By BigL sorry e-mail davidgrey9909@yahoo.co.uk thanks.
Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.