#1 Posted : 04 March 2009 12:27:00(UTC)
Rank: Guest
Admin

Posted By Safe System hi all, after another frustrating phone call to the HSE info line i am coming here for my advice! How often do self-contained oasis units powered by an on board generator need to be inspected? thanks,
Admin  
#2 Posted : 04 March 2009 13:41:00(UTC)
Rank: Guest
Admin

Posted By Ron Hunter Does the Unit require to be earthed when in use?
Admin  
#3 Posted : 04 March 2009 14:07:00(UTC)
Rank: Guest
Admin

Posted By Safe System It is earthed as far as a transportable building can be? - bearing in mind these are moved around aprox every 8-12 weeks usually.
Admin  
#4 Posted : 04 March 2009 15:10:00(UTC)
Rank: Guest
Admin

Posted By Safe System wow - longest i've had to wait for an answer...
Admin  
#5 Posted : 04 March 2009 15:17:00(UTC)
Rank: Guest
Admin

Posted By SteveD-M I think most are making a statement that this is a discussion forum not an advice line... Best free advice line... http://www.hse.gov.uk/el...y/maintenance/safety.htm
Admin  
#6 Posted : 04 March 2009 15:24:00(UTC)
Rank: Guest
Admin

Posted By Safe System nice statement.. can't wait to join the friendly family that is IOSH.
Admin  
#7 Posted : 04 March 2009 15:36:00(UTC)
Rank: Guest
Admin

Posted By SteveD-M User checks - 110 V – Weekly 230 V mains – Daily/every shift. Formal Inspection - 110 V – Monthly. Combined Inspection & test - 230 V – weekly 110 V – Before first use on site then 3 monthly 230 V mains – Before first use on site then monthly. General guidance as you will also require manufacturers recommendations and you have not clearly explained how it is used. Doesn't it feel good to shoot the messenger...
Admin  
#8 Posted : 04 March 2009 15:42:00(UTC)
Rank: Guest
Admin

Posted By Safe System But isn't that based around the HSE guideline for portable appliance testing? I am referring to oasis units (site offices as a whole) *removes remaining bullets from the gun...
Admin  
#9 Posted : 04 March 2009 17:01:00(UTC)
Rank: Guest
Admin

Posted By Ron Hunter Safe System: If as you say the Unit requires to be earthed, then that will mean providing sufficient earth spikes (which will depend on ground conditions, prospective fault current), and a full electrical test & certification of that temporary installation at each move (much as we would do for Construction Project temp. accommodation units with power and light). So.......I think you answer your own question - every 8- 12 weeks?
Admin  
#10 Posted : 05 March 2009 07:16:00(UTC)
Rank: Guest
Admin

Posted By Flic For those of us not in the know, it was not immediately apparent what you were talking about, and Google did not help. Clearly every time this thing is installed in a new position it needs a careful check. I would also suggest checks in between if the people using the site have any tendency to damage the installation and threaten its integrity. Flic
Admin  
#11 Posted : 05 March 2009 09:52:00(UTC)
Rank: Guest
Admin

Posted By SteveD-M I think he is referring to a portacabin. See previous thread. http://www.iosh.co.uk/in...iew&forum=1&thread=41668
Admin  
#12 Posted : 05 March 2009 10:27:00(UTC)
Rank: Guest
Admin

Posted By FAH Safe System - I'm assuming that your problem is in the UK. In which case, essentially you must do a risk assessment to determine both the frequency and extent of testing that you consider is essential to maintain the electrical safety of the unit[s]to an acceptable standard in the work, transport & storage conditions that will foreseeably arise. This will take in to account any odd specific legislative requirement [eg COMAH, ATEX, DSEAR sites etc] and also incorporate any client imposed requirements which will be, at best, variable. Frank Hallett
Admin  
#13 Posted : 05 March 2009 13:30:00(UTC)
Rank: Guest
Admin

Posted By Safe System Thanks all... makes me think the sparky was speaking tosh.. telling us he had to do it every 3 months.
Admin  
#14 Posted : 05 March 2009 23:25:00(UTC)
Rank: Guest
Admin

Posted By Ron Hunter But you've been given a link to a previous thread which confirms it IS every three months!????
Admin  
#15 Posted : 28 April 2009 14:26:00(UTC)
Rank: Guest
Admin

Posted By jennyhicks I'd get advice from the hse website or from a testing lab such as http://www.lambda-cal.co.uk .
Admin  
#16 Posted : 28 April 2009 17:06:00(UTC)
Rank: Guest
Admin

Posted By Ian Gardner Jenny, How exactly would an instrument calibration laboratory be able to advise on this matter?
Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.