Posted By Anthony Edwards
Hi there,

A heavy engineering plant uses trestles to rest work pieces on. The said trestles are built in house by coded welders, I feel they should be tested to what maximum capacity they should take. At present eight are holding a 20ft structure weighing in excess of 13 Tonne.

Thank you for any replies in advance

Tony
Admin  
#2 Posted : 07 April 2009 12:46:00(UTC)
Rank: Guest
Admin

Posted By paulw71
regulation6 PUWER


Inspection
6. - (1) Every employer shall ensure that, where the safety of work equipment depends on the installation conditions, it is inspected -


(a) after installation and before being put into service for the first time; or

(b) after assembly at a new site or in a new location,


to ensure that it has been installed correctly and is safe to operate.

Admin  
#3 Posted : 07 April 2009 12:47:00(UTC)
Rank: Guest
Admin

Posted By Ken M
Tony

I had a similar query here, but nothing to the size you described.

I had our Technical Director and chartered engineer look at each trestle get dimensions material etc etc and provide calculations to weight 1 trestle could hold 2 trestles etc etc.

Regard

Ken
Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.