This isn't strictly a health or safety question, more environmental, so apologies in advance. Does anyone have any experience with sub metering? I've collected and analysed data for our 2 sites' overall energy consumption and noticed that we have quite a high baseline use (when nobody is at work). I'd like to drill down into a few key areas and pin point the areas of high usage. One particular area I want to collect data on is the heating units for our ultrasonic immersion tanks (around 1000 litre capacity). How would I go about installing sub metering to collect half hourly readings of energy use? Are the portable options, or fixed only?
|
|
|
|
Rank: Super forum user
|
I was involved in a similar project a number of years ago were a pumping station was using a lot of power. I am not an electrician but I remember putting voltage or amp clamps around the electrical cables. These came with data loggers which we were able to calibrate (time and date) and we monitored the power over a couple of weeks. From this we were able to establish the pumps, lights, heating etc. were not using excessive power and we tracked the use down to a cable leaving the facility which was cut off! You may have to calculate the energy use from the voltage or amp readings. I also remember the electrician being worried there may be an earth leakage.
|
|
|
|
Rank: Super forum user
|
Originally Posted by: Climhazard This isn't strictly a health or safety question, more environmental, so apologies in advance. Does anyone have any experience with sub metering? I've collected and analysed data for our 2 sites' overall energy consumption and noticed that we have quite a high baseline use (when nobody is at work). I'd like to drill down into a few key areas and pin point the areas of high usage. One particular area I want to collect data on is the heating units for our ultrasonic immersion tanks (around 1000 litre capacity). How would I go about installing sub metering to collect half hourly readings of energy use? Are the portable options, or fixed only?
I have experience of both fixed, and temporary metering & current monitoring. You have a few options. I would like to understand a little more before I jump in with a recommendation though if I could please.
|
|
|
|
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.