Welcome Guest! The IOSH forums are a free resource to both members and non-members. Login or register to use them

Postings made by forum users are personal opinions. IOSH is not responsible for the content or accuracy of any of the information contained in forum postings. Please carefully consider any advice you receive.

Notification

Icon
Error

Options
Go to last post Go to first unread
PGra  
#1 Posted : 22 April 2020 10:42:17(UTC)
Rank: Forum user
PGra

Hi

We are craft bakery which uses FFP3 respirators in conjunction with LEV but also use PPE only for a small number of short term jobs such as hand dusting speciality bread loaves as they are loading into a conveyor oven. Although we have stock, our PPE supplier is now quoting a minimum of 6 months lead time for any new orders. This will result in use having no stock in the coming months. Although flour dust monitoring levels are below WEL, we will still be exposing staff to flour dust especially when doing the small jobs. 

My question is how do you think the HSE are going to enforce COSHH considering it is an absolute duty and the lack PPE supply.  

thanks 

thanks 1 user thanked PGra for this useful post.
martin paul jones on 22/04/2020(UTC)
Bigmac1  
#2 Posted : 22 April 2020 10:48:16(UTC)
Rank: Super forum user
Bigmac1

Apart from them being increasingly scare, there will be no change in thinking.

You need to think about the protection of the worker as well as regulation.

Why not try and source reusable instead of disposable FFP3 and give those who need it their own mask to look after. Try other suppliers or even other companies in your trade, demand will decrease in time but planning is 9/10ths of the law.

Look for more engineering controls, dust from a distance of introduce a portable LEV.

thanks 1 user thanked Bigmac1 for this useful post.
A Kurdziel on 22/04/2020(UTC)
chris.packham  
#3 Posted : 22 April 2020 12:43:48(UTC)
Rank: Super forum user
chris.packham

I had a situation last year where there was potential exposure, not to dust but to solvent vapour, that the existing LEV could not handle for technical reasons. The answer was a small, bench top, self-contained system that allowed the employee to carry out the task with adequate control. Whilst I have not seen the actual situation, from experience in bakeries I envisage that this could be a possible solution. If you let me have contact details in a PM I will happily provide you with information on the (U.K. manufactured) system and contacts.

PGra  
#4 Posted : 22 April 2020 14:01:21(UTC)
Rank: Forum user
PGra

thanks 2 users thanked PGra for this useful post.
Roundtuit on 22/04/2020(UTC), Kate on 23/04/2020(UTC)
Roundtuit  
#5 Posted : 22 April 2020 20:09:02(UTC)
Rank: Super forum user
Roundtuit

Very enlightening link - eliminating PPE through other controls seems to be the guidance

Edited by user 22 April 2020 20:09:59(UTC)  | Reason: FFS

Roundtuit  
#6 Posted : 22 April 2020 20:09:02(UTC)
Rank: Super forum user
Roundtuit

Very enlightening link - eliminating PPE through other controls seems to be the guidance

Edited by user 22 April 2020 20:09:59(UTC)  | Reason: FFS

Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.