Welcome Guest! The IOSH forums are a free resource to both members and non-members. Login or register to use them

Postings made by forum users are personal opinions. IOSH is not responsible for the content or accuracy of any of the information contained in forum postings. Please carefully consider any advice you receive.

Notification

Icon
Error

Options
Go to last post Go to first unread
Kloppite  
#1 Posted : 01 July 2021 12:48:41(UTC)
Rank: Forum user
Kloppite

Would vinyl floor welding require at hot-works permit ? 

We are being told from a new client after working with many others over the past 7 years, that this activity requires a hotworks permit. No naked flames are used and there is no contact with anything except the floor to be welded. The welding rod is electricaly heated so as to melt the plastic jointing material.

Roundtuit  
#2 Posted : 01 July 2021 13:02:28(UTC)
Rank: Super forum user
Roundtuit

An electric welding iron would not fit what most people would consider to be hotworks HOWEVER it is a source of heat that could potentially be left unattended so it would make sense to have some controls around its use. Perhaps your client has been reading this piece of HSE information:

https://www.hse.gov.uk/construction/safetytopics/processfire.htm

all hot work generating heat, sparks or flame can cause a fire. Precautions include: - clearing the area of combustible materials; - suitable fire extinguishers; and - maintaining a careful watch throughout the work. - a permit to work (PTW) system can help manage the risk on larger projects.

thanks 2 users thanked Roundtuit for this useful post.
Kloppite on 01/07/2021(UTC), Kloppite on 01/07/2021(UTC)
Roundtuit  
#3 Posted : 01 July 2021 13:02:28(UTC)
Rank: Super forum user
Roundtuit

An electric welding iron would not fit what most people would consider to be hotworks HOWEVER it is a source of heat that could potentially be left unattended so it would make sense to have some controls around its use. Perhaps your client has been reading this piece of HSE information:

https://www.hse.gov.uk/construction/safetytopics/processfire.htm

all hot work generating heat, sparks or flame can cause a fire. Precautions include: - clearing the area of combustible materials; - suitable fire extinguishers; and - maintaining a careful watch throughout the work. - a permit to work (PTW) system can help manage the risk on larger projects.

thanks 2 users thanked Roundtuit for this useful post.
Kloppite on 01/07/2021(UTC), Kloppite on 01/07/2021(UTC)
HSSnail  
#4 Posted : 02 July 2021 07:27:26(UTC)
Rank: Super forum user
HSSnail

sounds as if your client has no idea about work permits. Ask them what they want included. They have to be able to share and agree with you what the perscieved hazards are and what the controls should be.

We had some hot works done on a flat roof in our building - and these did use a flame gun. We agreed the contractor would have someone on watch in the room below (even though we have an automatic fire detection system) until 30 mins after the work was completed - and the permit was issued and signed by our facilities manager - not the contractor.

stevedm  
#5 Posted : 02 July 2021 07:43:31(UTC)
Rank: Super forum user
stevedm

sorry but if I have a £ for every time someone has said we have do it the same way for the past 7 years with no problem or nobody else has asked for that...the end is the client gets what the client wants...

The work involves the potential for fire so why wouldn't it be under a permit...easier to do and comply than argue and delay the job..

Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.