Welcome Guest! The IOSH forums are a free resource to both members and non-members. Login or register to use them

Postings made by forum users are personal opinions. IOSH is not responsible for the content or accuracy of any of the information contained in forum postings. Please carefully consider any advice you receive.

Notification

Icon
Error

Options
Go to last post Go to first unread
Admin  
#1 Posted : 03 March 2007 23:31:00(UTC)
Rank: Guest
Admin

Posted By john houlihan Does any one have any information on best practice in the scaffold industry regarding gaps in platforms or the work at height requirements?
Admin  
#2 Posted : 04 March 2007 00:53:00(UTC)
Rank: Guest
Admin

Posted By William I have always seen ply wood nailed down over the gaps, its about 5 mm think and you only need tacks just to keep them in place, you also need to think about when you strip the scaffold and also not going right through the scaffold board with a nails so a tack or small nail not more than 15mm will do. You would also need a bow saw handy to cut it to the right length
Admin  
#3 Posted : 04 March 2007 11:42:00(UTC)
Rank: Guest
Admin

Posted By J.D.F John,what size are these 'gaps'?.The spacing between the standards only allow for a two inch gap.As mentioned before ,these gaps can be covered.The working at height requirements are that if there is a danger of a person or material falling then there must be sufficient means in place as to prevent this from happening,Whether it be edge protection or a fully boarded scaffold platform,ALL risks must be assessed and reasonable measures put into place.What is the scaffold for?,can a M.E.W.P be used?,what about rope access? Good Luck .J.
Admin  
#4 Posted : 05 March 2007 11:10:00(UTC)
Rank: Guest
Admin

Posted By Descarte emailed regarding a recent near fatality incident involving a gap in working platform / access
Admin  
#5 Posted : 05 March 2007 14:26:00(UTC)
Rank: Guest
Admin

Posted By john houlihan Thankyou chaps. After doing a bit of research myself, I was told that driving nails or screws into scaffold boards would make them more susceptible to splitting or cracking and thus not satisfying the british standard criteria BS 2482. Also the plywood would present a tripping hazard to the platform. I have since been advised on a product specifically designed for this purpose. Ref: www.uniq-extrusions.co.uk BRLLIANT- Just what I was looking for, it solves all my problems.
Admin  
#6 Posted : 05 March 2007 14:28:00(UTC)
Rank: Guest
Admin

Posted By john houlihan To Descarte, Can you email the accident to my work email address- houlihan.jp@gmail.com Cheers, Thankyou
Admin  
#7 Posted : 08 March 2007 23:47:00(UTC)
Rank: Guest
Admin

Posted By Joe McCluskey Also to Descarte : Sorry to be a pest - can you also email the details of the accident to me ? Currently looking at Scaffold issues within our organisation joe@mccluskeyonline.com Ta in advance. Joe
Admin  
#8 Posted : 09 March 2007 08:33:00(UTC)
Rank: Guest
Admin

Posted By Emamode Descarte : Pls, can you email the details of the accident to me ? Currently I am reviewing the "Scaffolds and Access Reference Manuals" for my organisation. You can send it to adodedon@yahoo.com Rgds
Users browsing this topic
Guest (2)
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.