Rank: Guest
|
Posted By GavinR
Hi, quick question. We are installing a job crane (SWL 250kg,180o radius). For installation requirements to be met under stabilty and strength of LOLER is it always necessary to dig a full foundation square for a crane or can the stability for the depth be ascertained from the size of plug/bolts you use?
|
|
|
|
Rank: Guest
|
Posted By Bob Youel
All the benefits of a crane are lost if the base is not suitable - I advise that an appropriate engineer is engaged to design a suitable base as if it goes wrong at a later date!!!!!
|
|
|
|
Rank: Guest
|
Posted By al wood
i agree with bob you will need to employ the services of a competent engineer to determine the suitability of the base and the anchor bolts.
|
|
|
|