Rank: Guest
|
Posted By Steve Hickey
Please could someone help me out? I’m looking some examples of method statements for different types of scaffolding. I’ve searched around the net looking for some examples but cannot find any. Maybe someone could point me in the right direction
Thanks in anticipation
Steve
|
|
|
|
|
|
Rank: Guest
|
Posted By Martin Daly
What I think you are looking for are the manufacturers instructions for the safe use of their scaffolding. Your scaffolding supplier should be ably to supply you with these.
The standard for system modular scaffolding etc is HD 1000.
The standard for tube and fittings is BS5973.
yours
Martin Daly
|
|
|
|
|
|
Rank: Guest
|
Posted By Robert K Lewis
Don't forget also that SG 4.00 is the Code of Practice for erection of scaffold. The best methods are likely to define the specific hazards that are being dealt with together with an identification of the standards applicable.
Loading Bays are always going to be a specific design item and will depend upon the precise loadings to be applied. You should have drawings and sight of the underlying design calculations before erection.
Bobb
|
|
|
|
|
|
Rank: Guest
|
Posted By Ed Carter
Steve,
I'm not sure if I have what you are after but
if you e-mail me 'll send you a blank which you can adjust to include what you require.
Ed
|
|
|
|
|
|
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.