Posted By martin knox Where Calcium Hypochlorite crystals are used in the dosing pool plant system, apart from someone inadvertantly mixing a acid by mistake or purposely, what are the real risks of any chlorine gas be generated in sufficient quantities to require a chlorine detector to be fitted with alarm. I have queried this with the pool plant installers, and their line is " Calcium Hypochlorite has been used for a number of years instead of Chlorine Gas, and we have not come across one incident where chlorine gas or chlorine levels have been generated in quatities that would justify installing a detector on a installation. The installation at question is a new build 2002. Can anyone advise me otherwise or give hard evidence that I may put forward to argue the point under CDM or is there no real chance other than operator error or sabotage of this scenario being realised. I know all the usual stuff - Chlorine heavier than air etc, normally measured at 10 ppm etc, what I need is hard tangible evidence or facts to justify the need to install this technology. NB - all of the pool plant operators x 3, have been trained on PPOC, so they are trained. Thanks in advance Martin
Admin  
#2 Posted : 09 November 2002 21:53:00(UTC)
Rank: Guest
Admin

Posted By Ken Taylor I'm only aware of the need for Cl2 detection/alarms when storing the gas for dosing. To the risks of sabotage and operator error you could add 'continuing dosing during circulation failure'. The usual controls include effective interlocking of dosing to circulation. It's worth checking this as I once found a flow-switch held open by the head of water due to poor pipework design.
Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.