#1 Posted : 14 November 2006 16:44:00(UTC)
Rank: Guest
Admin

Posted By Dan dan The common ground here is that we dont dig trenches near temporary structures i.e. near erected scaffolding. is there a minimum distance away from the temp structure we can dig our trench and can this be located in writing. regards and thanks in advance
Admin  
#2 Posted : 14 November 2006 16:54:00(UTC)
Rank: Guest
Admin

Posted By Dave McIness No. Depends on ground conditions - type of soil/rock, water content, cohesiveness of soil, its bearing capacity etc etc... Also depends on the size and extent of the temporary structure, and what loading is being transferred to the ground. Other factors for consideration include the proximity of vehicles and heavy plant which may affect the excavation. Not the answer you are looking for, but its down to risk assessment!
Admin  
#3 Posted : 14 November 2006 17:25:00(UTC)
Rank: Guest
Admin

Posted By peter gotch Hi Dan, Wants proper engineering assessment [including adequate assessment in the design stage] Regards, Peter
Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.