Welcome Guest! The IOSH forums are a free resource to both members and non-members. Login or register to use them

IOSH Forums are closing 

The IOSH Forums will close on 5 January 2026 as part of a move to a new, more secure online community platform.

All IOSH members will be invited to join the new platform following the launch of a new member database in the New Year. You can continue to access this website until the closure date. 

For more information, please visit the IOSH website.

Postings made by forum users are personal opinions. IOSH is not responsible for the content or accuracy of any of the information contained in forum postings. Please carefully consider any advice you receive.

Notification

Icon
Error

Options
Go to last post Go to first unread
Admin  
#1 Posted : 31 July 2007 20:41:00(UTC)
Rank: Guest
Admin

Posted By Alang
Hi everyone,

Again thank you in advance for your comment/help.

I am trying to develop a safe system of work with regards to witnessing, testing and powering up a substation, after a (near miss happened were by x3 HV leads were not connected and it was only by chance it was noticed before the powering went ahead) this substation was going to be carrying 11000 volts, a fair old belt if this was not noticed.

I was wondering if anyone would have a safe system of work I could look at or point me in the right direction.

Regards

Alan
Admin  
#2 Posted : 01 August 2007 16:40:00(UTC)
Rank: Guest
Admin

Posted By Paul Clarke-Scholes MIOSH
You might be better off with a good old fashioned quality check sheet (call it a permit to power up if you wish). Something along the lines of "I the installation foreman have checked that all the cables have been connected and that the juice can flow". Amazing how making someone put a signature on a piece of paper makes them actually do the double check. For extra safety get a countersignature.

Paul
Admin  
#3 Posted : 01 August 2007 18:06:00(UTC)
Rank: Guest
Admin

Posted By Paul Darby
We had a similar start up sheet when I used to test rocket engines. We got a small team of experienced people together and formulated a signature check sheet that formed the "go" to fire.

We started with a blank piece of paper and after an hour of discussion and simulating a firing we eventually had over 30 checks on the sheet.

Then the station superintendant was the final sign off. It worked really well and never came close to letting us down.
Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.