IOSH forums home
»
Our public forums
»
OSH discussion forum
»
BS EN 81-28 Safety rules - Lift constuction and Installation
Rank: Guest
|
Posted By joolz040770 Hello,
Does anyone have experience of the above? I am investigating an incident and trying to find out the correct interval for testing the lift intercom. Some European rules are approx. every 3 days and not to wait until maintenance is carried out. I'm wondering what BS says. Can you help?
Tks
Joolz
|
|
|
|
Rank: Guest
|
Posted By joolz040770 I managed to obtain an answer though I'm not too thrilled at it. You are all hopeless; my first thread and no response. :-( Only kidding. :-)
|
|
|
|
Rank: Guest
|
Posted By Paul This is what BS EN 81-28 says;
The alarm equipment shall automatically simulate the input signal of an alarm(automatic test) and set up the subsequent connection to the reception equipment for testing purposes as frequently as required by the safety of users when the lift is used as intended, but at least every 3 days.
|
|
|
|
Rank: Guest
|
Posted By joolz040770 Most helpful Paul but is completely different to the information emailed to me by IOSH. I like your answer better! :-)
|
|
|
|
IOSH forums home
»
Our public forums
»
OSH discussion forum
»
BS EN 81-28 Safety rules - Lift constuction and Installation
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.