Rank: Forum user
leerob

Hello, I am trying to navigate the grey areas of the reporting system in relation to RIDDOR's. We recently had an incident on site when a contractor dropped part of a 4 leaf manhole lid ontop of an HV cable located at the bottom of the manhole pit. The steel leaf damaged the cable upon falling which resulted in a flash and a bang, luckily the operative had let go of the key and leaf as it was falling, there were no injuries. The substations where switched out and the damaged cable was by-passed until it was available for repair. 

Would this be deemed as reportable, would you class this as an electrical explosion or a significant risk of death?

antbruce001  
#2 Posted : 19 May 2022 10:09:38(UTC)
Rank: Forum user
antbruce001

I would say this is reportable as a DO under;

"

  • 4 Any explosion or fire caused by an electrical short circuit or overload (including those resulting from accidental damage to the electrical plant) which either:
    1. results in the stoppage of the plant involved for more than 24 hours; or
    2. causes a significant risk of death. "

There is no debate as to the fact there was an electrical explosion caused by a 'short circuit', so the first part of the requirement is met.

So to be reportable it then needs to met atleast 1 of the 2 sub requirements. 

So, if it would take over 24 hours to make the repair (excluding any time for ordering parts etc) then sub part 1 would be met. I assume this is the case. I would consider the 'plant' as being the cable - but some may disagree.

As to 'cause a significant risk of death' this is a bit more subjective. In this context, the cause is the explosion, not the risk of receiving a fatal 'shock'. The DO is covered elesewhere, and a shock must have been received for it to apply. 

Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.